Oil Pipeline Expected To Be Done By Mid-2014 - KTUL.com - Tulsa, Oklahoma - News, Weather & Sports

Oil Pipeline Expected To Be Done By Mid-2014

Posted: Updated:

FLANAGAN, Ill. (AP) - A 600-mile pipeline extending from Illinois to Oklahoma could be ready by this summer.

That's according to a report (http://bit.ly/1gdXOiF ) by WNIJ Radio.

The pipeline belonging to Enbridge Inc. of Calgary, Alberta will carry tar sands from Flanagan, Ill. near Pontiac to Enbridge's terminal in Cushing, Okla. It also travels through Missouri and Kansas.

From Oklahoma, the oil could be moved through existing lines to Gulf Coast refineries. The Flanagan South pipeline runs parallel to another Enbridge route that's already in place.

Construction began in August 2013.

A spokeswoman for Enbridge says work is Illinois is mostly complete. But this winter's bitter temperatures slowed down work putting topsoil back over the pipeline in some areas.

Still the project is set to be done in mid-2014.

Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • Top Videos

Most Popular

Stories
Videos
loading...
Powered by WorldNow

P.O. Box 8 Tulsa, OK 74101-0008

Powered by WorldNow

All content © Copyright 2000 - 2014 Worldnow and KTUL. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.